|
Rolleston Thermal Coal Project (100% MIM) MIM is to proceed with the development of an eight million tonne per annum thermal coal mine at Rolleston in Queensland. Rolleston is located in the south-west of the Bowen Basin, 16 kilometres west of the town of Rolleston and 275 kilometres due west of the established coal port of Gladstone. MIM's Rolleston coal tenements comprise an estimated 600 million tonnes of coal resources. Rolleston is a low ash coal (7.5% in combustion trials) with an energy rating of 5730 kcal/kg on a net as received basis. It has moderate sulphur levels and produces low NOx emissions upon combustion. The capital cost of the mine is estimated to be $175 million for the initial 6 mtpa development with a further $75 million when the second dragline and associated mining equipment are introduced. Work on long lead items will begin immediately, with the major development work to commence once the mining lease and other outstanding regulatory approvals are granted over the coming months. The mine development includes the construction of a heavy rail line by QR which will link the Rolleston Mine to the central Queensland line to Gladstone. An information release on the Rolleston Coal Mine is available for Download [Acrobat - 120Kb].
Regional economic benefits The Rolleston mine would bring significant economic benefits to Australia, Queensland and the region.
Rolleston Coal Project Newsletters Rolleston Coal Project Community Newsletters are available to download below:
The first train load of Rolleston Coal is loaded near Emerald. Mining operations at the Rolleston sample pit. |